Tuesday, January 7, 2020

Schwinn Paramount -- Finishing the installation of the bottom bracket

Received the bottom bracket tool, missing link and some spare brake cables over the break. 

The LH side has a thread-locking compound already on the "nut" & is tightened till it bottoms out (with some minimal torque -- about 10 - 15 lb-ft). 

The white thread-locker material is still visible on the "nut." 

Fully installed and torqued.

No comments:

Post a Comment