![]() |
| It's raining steadily but it's pretty light. Sun is supposed to come out in the afternoon... |
Monday, May 25, 2020
Garage Organizing - part 28 - Prepping a couple of crates for the middle lower cabinet
![]() |
| There's still space to be filled up... |
![]() |
| There are large auxiliary fog/driving lights for the front of the Mercedes (like they used on the cars for rally racing, in period...). |
![]() |
| Bicycle Pannier rack/pannier & some other bags... |
![]() |
| Other bags with bags, cushion & blanket inside. |
![]() |
| The bag in the front has other bags in it. Pretty much filled up the cabinet... |
Sunday, May 24, 2020
Garage Organizing - part 27 - Prepping a couple of crates for the middle lower cabinet
![]() |
| Taking pictures of what's going in the two crates. This is the smaller crate. I'll never remember... |
![]() |
| 914 interior door handle, MGB wiring, MGB bumper guards, etc. |
![]() |
| Heat shielding material, wire loom protector & an old Buick clock/speaker combo... |
![]() |
| Brass carburetor & motorcycle gauges. |
Sunday, May 17, 2020 -- Marina Del Rey -- There's rain coming tomorrow... Some big waves...
Garage Organizing - part 26 - Moving stuff under the flat file, stainless steel upper cabinets & skateboards
![]() |
| A lot of the stuff in this aisle space was able to be moved under the flat file on the left of this picture (there's about 3 to 4 inches of space under it). |
![]() |
| After the band saw was moved over a few inches, there's still a good amount of space between it and the flat file on the right... |
![]() |
| The stuff on the floor and on top of the light gray cabinet need to find homes... |
![]() |
| Rearranging stuff in the stainless steel upper cabinets (on the RH side wall of the garage). |
![]() |
| Moved the three skateboards onto these large hooks on the rafters. A little hard to get to but not too bad... |
Saturday, May 23, 2020
Garage Organizing - part 25 - left rear corner shelving unit and the space next to the band saw...
![]() |
| Since I had to clear out most things from the left rear of the garage, it's a good chance to reorganize and maximize the storage in the corner shelf unit. |
![]() |
| Pretty much packed the corner shelf unit. The top shelf is for bicycle parts (tires, tubes, etc.). |
![]() |
| Reorganized some of the tool boxes below the table saw. Three of the four tool boxes in this picture were recently moved into this area. What was there before will go somewhere else... |
![]() |
| This is about as much as I can practically put into this space. |
Saturday, May 16, 2020 -- Bike Path to Marina Del Rey -- Very Crowded
![]() |
| Busy on the Marina Del Rey Channel -- Boats coming back into the marina |
![]() |
| Many boats going out of the Marina too... |
![]() |
| There's three seating areas in this little "park." I choose the spot with shade, if it's not occupied... |
![]() |
| The red tide is basically gone now... |
![]() |
| The variety of bikes is amazing. You never seem to see the same bike twice... |
Garage Organizing - part 24 - Moving the island flat file a few inches...
![]() |
| There's room to move the band saw and the island flat file over a few inches to make more room on the book case side of the garage. |
![]() |
| View towards the back of the garage showing room for the band saw to move over a little bit. |
![]() |
| The band saw is on wheels so it's easy to move it out of the way (had to sweep up all the sawdust under it...). |
![]() |
| Band saw base with wheels & lift/drop mechanism. |
![]() |
| Moved the flat file over a few inches then put the band saw back... |
![]() |
| Moved the flat files over just enough so that the drawers can still be opened without interfering with the red post. |
![]() |
| Moved the rolling book shelf from the book case side to the end of the flat files. |
Friday, May 22, 2020
Garage Organizing - part 23 - Finding more homes for stuff...
![]() |
| Makita drill kit. Handy setup for working "off site" |
![]() |
| Overview of which tool box the rasp drill bits are in. |
![]() |
| The stainless steel shelf units have a lip on the bottom that I can clip hooks to. I've placed a hook between the two tool boxes to hang... |
![]() |
| a drag racing parachute "pre-chute" (this is the first thing that "spring" out to catch the wind and pulls the large chute out) |
![]() |
| The space above the Bosch tool box is just enough for a large clear plastic bin. Will fill the bin with stuff later (but it can't be too heavy, so relatively light stuff...). |
Tuesday, May 12, 2020 -- Marina Del Rey -- Clouds & Windy; Red tide is fading...
![]() |
| It's cool (high 60s) and more windy than usual. Makes getting to this turnaround point hard (ride directly into the headwind)... |
![]() |
| The puffy white clouds are fantastic... |
![]() |
| Rare to see a tug boat on the Marina Del Rey channel... |
![]() |
| More clouds... The ride from home to this turnaround point and back takes a little less than 1/2 hour... (about 9 miles) |
![]() |
| The red tide is going away. I can see more of the rocks under the water and the color is fading... |
Subscribe to:
Posts (Atom)

















































