Friday, March 5, 2021
Current State of the Garage...
A lot of stuff has been moved to the storage bins.
The horizontal surfaces still need to have the stuff put away but there should be space now to move the stuff around...
Thursday, March 4, 2021
Storage #2 -- Filled
The stuff going into this storage unit are not in stackable bins.
So, I bought a rack to go inside.
Loops...
The bougainvillea does a double loop (two vines doing complete 360s) around each other.
Pretty amazing...
Wednesday, March 3, 2021
Tuesday, March 2, 2021 -- Manhattan Beach Pier -- Warm & Sunny Day (mid 70s)
Was concerned that the bike path may be covered in sand because of the Santa Ana winds over the weekend.
But, was pleasantly surprised that the bike path had been cleared.
Didn't have to ride over any sand at all!
Epoxy test -- after sanding
After sanding the wood around the epoxy...
Looks pretty nice.
Because this is in a curved part of the wood, the epoxy is a depression, instead of being flush.
It would not be possible to get it to follow the shape of the wood's curvature because it's a "positively" curved surface.
Subscribe to:
Posts (Atom)




















































