This was the starting point. The idea is to reduce the footprint by getting rid of the stuff on the LH side. |
This is all the stuff that I got rid of. |
Ended up moving the RH side fold-out tray to the LH side. |
The tray is held in place with three screws that hold the assembly together and one that's just to hold the tray to the tubing. (4 total) |
This is after removing the RH tray. I put the screws back in place (the top two screws hold the upper tray in place) |
Cut the tubing off on the LH side (used a hacksaw with a yellow painted blade; thus all the yellow debris...). |
In the process of cutting off the tubing that sticks out. |
In order to mount the fold-out tray on the LH side, one of the "legs" had to be cut shorter and new holes had to be drilled on the other leg. |
Tray is fully installed. The cutoff tubing ends are not exposed. |
The top of the picture shows the tray basically covering the cut off tubing. |
Finished. The footprint is greatly reduced (compare to the first picture) and the RH side tubing, which is now exposed, can be used as a handle for pushing the cart around. |
No comments:
Post a Comment