Saturday, September 28, 2024 -- Cross bars

Set up the drill press for drilling 7/16" holes.
Used this small back-stop to locate the frame.
Centered the hole across the piece.
Hole depth was set to about 1/2 way through the wood.
Had to clear enough junk out of the way to allow the frame to be set on the drill press.
All 6 cross bars installed.
Sanded the piece with 100 then 180 grit paper.
Ready for finishing.

 

Saturday, September 28, 2024 -- mahogany

I had bought this broken pieces of mahogany when I bought the poplar sticks for the frame.
I glued the two pieces together.
Will let it dry overnight.


Took the clamps off the next day.







Saturday, September 28, 2024 -- Brass HInges

Went to the local Ace hardware & bought a couple of solid brass hinges.
Placed some rubber pads on the bottom.
The pads have self-adhesive backs but also used a screw to keep the pads in place.